Mining Operation

PLC Programming Software Code Conversion

Paradigm was engaged to provide Specialist Engineering Services to carry out conversion and testing of PLCs at a coal mining plant. The scope included the following:

• Conversion of PLC Software from ProWorx NXT to Unity Pro XL V11.0.

• Modification of PLC Rack Layout to account for dual slot PLC Processors, where required by project size.

• Structured testing of identified standard types of code (i.e. drive type code, process standard interfaces, interlocking).