Paradigm was engaged to perform a selection phase study for a shiploader anti-collision system as part of an overall project involving the design and installation of a new shiploader.
Our scope of work included initial control system and electrical design, functional safety lifecycle documentation (such as safety requirements specification and safety software design specification) and scope of work and cost estimate for the next detailed design phase.