Paradigm was engaged to provide of Specialist Engineering Services to carry out a feasibility study for various aspects of the following works:
• The replacement of the Cable Reelers on Coal Stackers and Reclaimers and the Product Coal stackers.
• The replacement of the long travel drives on Raw Coal and Product Coal stackers.
• The extension/replacement of the switchrooms or the switchboards for the subject machines as affected by the Cable Reeler and Long Travel works.